In the box, you will find the following items: | |||
*One Dell PowerEdge R330, (http://www.dell.com/support/home/us/en/04/productsupport/product/poweredge-r330/manuals) | |||
*One TelcoBridges Important Notice (pertinent product serial numbers and other important information). | |||
*One set of static rails and associated installation hardware. | |||
*One packing slip. | |||
*Two AC power cables (optional). | |||
<br><br> | <br><br> | ||
==7800 Series Telecom Unit== | |||
---- | ---- | ||
In the box, you will find the following items: | |||
*One 7800 series unit (TMGIP7800, TMG7800-TE, TMG7800-DS3, or TMG7800-STM1). | |||
*One set of mounting brackets and screws, used to mount the 7800 series telecom unit to a 19" rack. | |||
*One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800 series telecom unit. | |||
*Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length. | |||
*One Important Notice (two-sided document containing pertinent product serial numbers, and other important information). | |||
*One Product Warranty. | |||
*One packing slip. | |||
*Two AC power cables (optional) | |||
Specifically with the TMG7800-TE unit you will also have: | |||
*One or two patch panel(s) | |||
*Two SCSI cables per patch panel. | |||
Not included | |||
*A 19” equipment rack. The 7800 series telecom unit must be installed on a 19” wide equipment rack. | |||
*USB-Type B cable. This can be used as an alternative way to connect to the serial port of the telecom unit. | |||
<br><br> | <br><br> | ||
==7800-TMS Media Switch== | |||
---- | ---- | ||
In the 7800-TMS media switch box, you will find the following items: | |||
*One 7800-TMS unit (TMG7800-TMS or TMGIP7800-TMS). | |||
*Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length. | |||
*One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800-TMS. | |||
*One set of mounting brackets and screws, used to mount the TMG7800-TMS to a 19" rack. | |||
*One Important Notice (two-sided document containing pertinent product serial numbers, and other important information). | |||
*One Product Warranty. | |||
*One packing slip. | |||
*Two AC power cables (optional) | |||
Not included | |||
*A 19” equipment rack. The 7800-TMS must be installed on a 19” wide equipment rack. | |||
*You must order one TelcoBridges CAT7 shielded Ethernet crossover cable, with RJ45 type male-male connectors, for each connection between 7800 Telecom units and a 7800-TMS. | |||
*If your system features a second 7800-TMS, you must order an additional TelcoBridges CAT7 shielded Ethernet cable, with RJ45 male-male terminations, for each 7800 Telecom Unit. | |||
<br><br> | <br><br> | ||
==7800 N+1 Patch Panel== | |||
---- | ---- | ||
The 7800 N+1 Patch Panel contains the following items: | |||
*One 7800 N+1 patch panel. | |||
*Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length. | |||
*One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800 N+1 patch panel. | |||
*One set of mounting brackets and screws, used to mount the 7800 N+1 patch panel to a 19" rack. | |||
*Two AC power cables (optional) | |||
*One packing slip. | |||
*One Important Notice (two-sided document containing pertinent product serial numbers, and other important information). | |||
*One Product Warranty. | |||
Not included | |||
*Optic fibers (They can be purchased from TelcoBridges). | |||
*A 19” equipment rack. The 7800 N+1 patch panel must be installed on a 19” wide equipment rack. | |||
<br><br> | <br><br> | ||
==7800 1+1 Patch Panels== | |||
---- | ---- | ||
1+1 patch panels are required for the proper connection of the 7800 series 1+1 system, and are automatically included when a 7800 +1 series unit is ordered. The following table lists various 1+1 patch panels you will receive based upon the type of 7800 series telecom unit ordered for your 7800 series 1+1 system. | |||
{| class="wikitable" | |||
|+ 1+1 Patch Panels | |||
|- | |||
| 1+1 Patch Panel (32/T1/E1) | |||
| Provides connection for up to 32 T1/E1 lines from the network to the 7800-TE and 7800-TE+1. | |||
To connect the 7800-TE-16 and the 7800-TE-32 to their respective +1 units and the network, you will required one 1+1 Patch Panel (32 | |||
T1/E1). | |||
To connect the 7800-TE-48 and the 7800-TE-64 to their respective +1 units and the network, you will require two 1+1 Patch Panel (32 | |||
T1/E1). | |||
Cables provided: | |||
4 SCSI straight cables per 1+1 Patch Panel (32 T1/E1). Three meters in length. This provides connection for up to 32 lines. | |||
|- | |||
| 1+1 Patch Panel (DS3) | |||
| Provides connection for up to 3 DS3 lines from the network to the 7800-DS3 and 7800-DS3+1. | |||
Cables provided (with each 1+1 Patch Panel (DS3)): | |||
*4 DS3 cables, each two meters in length, are shipped for each DS3 that is ordered. (4, 8, or 12 cables) | |||
*4 RJ48C straight cables (yellow), two meters in length. | |||
|- | |||
| 1+1 Patch Panel (STM1) | |||
| Provides connection of 1 STM1 line from the network to the 7800-STM1 and 7800-STM1+1. | |||
Cables provided (with each 1+1 Patch Panel (STM1)): | |||
*4 pairs of fiber optic cables, two meters in length. | |||
*4 RJ48C straight cables (yellow), two meters in length. | |||
|} | |||
<br><br> | <br><br> | ||
==Rack Mounting the 7800 Series Gateway Equipment== | ==Rack Mounting the 7800 Series Gateway Equipment== | ||
---- | ---- | ||
The 7800 series equipment is mounted on a customer provided equipment rack using the mounting hardware packaged in each box. | |||
<br><br> | <br><br> | ||
===Prerequisites=== | ===Prerequisites=== | ||
---- | ---- | ||
To rack mount the equipment, you will need: | |||
*One customer-provided equipment rack, measuring 19” in width and 31.5” in depth. The rack must be solidly anchored to the floor with appropriate support at the top of the racks. | |||
*Climate controlled room: 0 to +50 Celsius, 0 to 95% non-condensing humidity. | |||
<br><br> | <br><br> | ||
===Vertical Placement of the Equipment=== | ===Vertical Placement of the Equipment=== | ||
---- | ---- | ||
The 7800-CTRL and 7800-TMS are each housed in 1U chassis, while 7800 Telecom units are housed in 2U chassis. It is important that you provide for enough room on the equipment rack to allow for the installation of the equipment. | |||
Consider the available space on your equipment rack and the height of one or two 7800-CTRL unit(s), one to sixteen 7800 Telecom unit(s), and from zero to two TMG7800-TMS units. Due to the rear-exhaust heat vents and the efficient heat dissipation design, there is no need to leave any physical | |||
vertical space above or below the 7800-CTRL unit(s), 7800 N+1 patch panel(s), 7800 Telecom unit(s), and the 7800-TMS unit(s) on the equipment rack. | |||
{| class="wikitable" | |||
|+ Tmedia VoIP Gateway Physical Height | |||
|- | |||
! Tmedia Model Number !! Vertical Height | |||
|- | |||
| 7800-CTRL || 1U (1.68 inches or 42.80 mm) | |||
|- | |||
| 7800 Telecom Unit || 1U (1.75 inches or 44.45 mm) | |||
|- | |||
| 7800-TMS || 1U (1.75 inches or 44.45 mm) | |||
|- | |||
| RJ48C Patch Panels || 1U (1.75 inches or 44.45 mm) | |||
|- | |||
| 7800 N+1 Patch Panels || 1U (1.75 inches or 44.45 mm) | |||
|} | |||
<br><br> | <br><br> | ||
===Installing the 7800 Series Gateway on an Equipment Rack=== | ===Installing the 7800 Series Gateway on an Equipment Rack=== | ||
---- | ---- | ||
The 7800-CTRL, 7800 Telecom Unit, and 7800-TMS are mounted on a 19" equipment rack using the angle brackets and screws provided in the box. | |||
<br><br> | <br><br> | ||
====7800-CTRL==== | ====7800-CTRL==== | ||
---- | ---- | ||
To install the 7800-CTRL on the equipment rack, refer to either the static or sliding rails installation instructions in the following Dell document: | |||
*Dell PowerEdge R330, (http://www.dell.com/support/home/us/en/19/productsupport/product/poweredge-r330/manuals) | |||
<br><br> | <br><br> | ||
====7800 Telecom Units==== | ====7800 Telecom Units==== | ||
---- | ---- | ||
#Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 Telecom Unit, when viewed from the front. Do the same for the angle bracket on the right-hand side. | |||
#Start mounting equipment beneath the 7800-CTRL, keeping in mind the space required on the equipment rack. | |||
#Repeat steps 1 and 2 for each additional 7800 Telecom Unit. | |||
{| class="wikitable" | |||
|[[File:NoteIcon.png|100px]]|| f you are installing TMG7800-TE units you will require one to two patch panels per TMG7800-TE. Mount the patch panels beneath each TMG7800-TE. | |||
|} | |||
<br><br> | <br><br> | ||
====7800-TMS==== | ====7800-TMS==== | ||
---- | ---- | ||
#Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800-TMS, when viewed from the front. Do the same for the angle bracket on the right-hand side. | |||
#Start mounting equipment beneath the last 7800 Telecom Unit, keeping in mind the space required. | |||
#Repeat steps 1 and 2 for a second 7800-TMS. | |||
<br><br> | <br><br> | ||
====7800 N+1 Patch Panel==== | ====7800 N+1 Patch Panel==== | ||
---- | ---- | ||
#Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 N+1 patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side. | |||
#Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack. | |||
#Repeat steps 1 and 2 for a second 7800 N+1 patch panel. | |||
<br><br> | <br><br> | ||
====7800 1+1 Patch Panel==== | ====7800 1+1 Patch Panel==== | ||
---- | ---- | ||
#Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 1+1 patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side. | |||
#Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack. | |||
3. If required, repeat steps 1 and 2 for a second 7800 1+1 patch panel. | |||
<br><br> | <br><br> | ||
====7800 RJ48C Patch Panel==== | ====7800 RJ48C Patch Panel==== | ||
---- | ---- | ||
#Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 RJ48C patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side. | |||
#Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack. | |||
#If required, repeat steps 1 and 2 for a second 7800 RJ48C patch panel. | |||
<br><br> | <br><br> | ||
Revision as of 11:44, 8 October 2024
About this Guide
This guide provides installation, and setup procedures for the 7800 series gateway.
Conventions
| Terminology | Description |
|---|---|
| 7800 series gateway | This term is used when a description applies to both a TMG7800 and the TMGIP7800 systems. |
| 7800 series system | This term is used when a description applies to a TMG7800-CTRL, TMG7800 Telecom Unit and TMG7800-TMS. |
| TMGIP7800 system | This term is used when a description applies to a TMGIP7800-CTRL, TMGIP7800 Telecom Unit and TMGIP7800-TMS. |
| 7800-TE | This term is used when a description applies to TMG7800-TE. |
| 7800-DS3 | This term is used when a description applies to the TMG7800-DS3. |
| 7800-CTRL | This term is used when a description applies to a TMG7800-CTRL and TMGIP7800-CTRL. |
| 7800-TMS | his term is used when a description applies to a TMG7800-TMS and TMGIP7800-TMS. |
| TMG7800 +1 | This term is used when a description applies to a TMG7800 that is selected to provide N+1 protection. |
| 7800 N+1 Patch Panel | This term is used to refer to patch panels for TMG7800 systems that have N+1
protection. |
Contact Us
If you have comments about this guide or any other TelcoBridges technical documentation, please send an email to marketing.
Introduction
Identifying the 7800 Series Gateway Equipment
The 7800 series gateway is comprised of the following equipment:
- One or two 7800-CTRL gateway controller(s).
- One to sixteen 7800 Telecom Unit(s).
- Based upon the configuration of your 7800 series gateway, the number of 7800-TMS media switches may range from zero to two.
- If the 7800 series gateway employs N+1 protection, one to two 7800 N+1 patch panels are used to provide protection for the TDM network.
- If the 7800 series gateway employs 1+1 protection, one to two 1 +1 patch panels are used to provide protection for the TDM network.
Installation Prerequisites
For the installation to proceed without interruption, it is important that you verify you have all necessary materials on hand.
A TMG7800 system can range in size from 2 to 22U in vertical rack space, at full capacity with redundant N+1 patch panels. In addition, if your system is configured to use multiple groups of 1+1 patch panels, the total vertical rack space may exceed 22U.
7800-CTRL
For information about the 7800-CTRL, refer to Dell’s documentation:
http://www.dell.com/support/home/us/en/04/product-support/product/poweredge-r330/manuals
Adequate space for the installation of the 7800-CTRL
You must mount the 7800-CTRL on a 19" equipment rack (customer provided). Your 7800-CTRL is a 1U unit. Plan for an additional 1U space on the equipment rack for a redundant 7800-CTRL.
Adequate power supply and power connections
Each 7800-CTRL requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.
An IP address for the management port
Each 7800-CTRL requires a IP address for the management port. To avoid delays, you should have the IP address, netmask and gateway addresses on hand. Take note that the management port supports DHCP.
Cabling
Three customer supplied Ethernet cables are required for each 7800-CTRL, to connect the 7800-CTRL to the switches.
7800 Series Telcom Units
Adequate space for the installation of each 7800 Series Telecom Unit
You must install each 7800 Series Telecom Unit (1-16 units) on a 19" equipment rack (customer provided). Each 7800 Series Telecom Unit is housed in a 1U chassis.
Adequate power supply and power connections
Each 7800 Series Telecom Unit requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.
7800-TMS
Adequate space for the installation of the 7800-TMS
You will need to mount the 7800-TMS on a 19" equipment rack (customer provided). Your 7800-TMS is a 1U unit. Plan for an additional 1U space on the equipment rack for a redundant 7800-TMS.
Adequate power supply and power connections
Each 7800-TMS requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.
7800 N+1 Patch Panel
Adequate space for the installation of the 7800 N+1 Patch Panel
If your system employs N+1 protection, you will need to mount the 7800 N+1 patch panel on a 19" equipment rack (customer provided). Your 7800 N+1 patch panel is a 1U unit. If your system is using Automatic Protection Switching (APS), plan for an additional 1U space on the equipment rack for a second 7800 N+1 patch panel.
Adequate power supply and power connections
Each 7800 N+1 patch panel requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.
7800 1+1 Patch Panel
Adequate space for the installation of the 7800 1+1 Patch Panel
If your system employs 1+1 protection, you will need to mount one or two 7800 1+1 patch panels on a 19" equipment rack (customer provided). Your 7800 1+1 patch panel is a 1U unit.
Adequate power supply and power connections
Each 7800 1+1 patch panel requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.
7800 RJ48C Patch Panel
Adequate space for the installation of the 7800 RJ48C Patch Panel
In a standalone configuration, you will need to mount one or two 7800 RJ48C patch panels on a 19" equipment rack (customer provided). Your 7800 RJ48C patch panel is a 1U unit.
Adequate power supply and power connections
Each 7800 RJ48C patch panel requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.
Preventing Electrostatic Discharge Damage
Electrostatic discharge (ESD) can damage equipment and impair electrical circuitry. This may occur if electronic printed circuit cards are improperly handled and may cause complete or intermittent failure.
Recommended Reading
This document is written with the assumption that you have a clear understanding of the installation of the equipment described in this document and you are trained to work with the equipment. If you have any technical questions, TelcoBridges TB Support can be reached at the following numbers, or an email can be sent to: support.
- Americas & Europe Technical Support Centre (GMT-05:00, Montreal): Telephone: +1-450-655-8993 x131 or x102
- Asia Technical Support Centre (GMT +08:00, Hong Kong): Telephone: +852-3749-9818
- 24/7 International Support: Telephone: +1-866-438-4703
Installation Preparations
7800-CTRL Gateway Controllers
In the box, you will find the following items:
- One Dell PowerEdge R330, (http://www.dell.com/support/home/us/en/04/productsupport/product/poweredge-r330/manuals)
- One TelcoBridges Important Notice (pertinent product serial numbers and other important information).
- One set of static rails and associated installation hardware.
- One packing slip.
- Two AC power cables (optional).
7800 Series Telecom Unit
In the box, you will find the following items:
- One 7800 series unit (TMGIP7800, TMG7800-TE, TMG7800-DS3, or TMG7800-STM1).
- One set of mounting brackets and screws, used to mount the 7800 series telecom unit to a 19" rack.
- One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800 series telecom unit.
- Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length.
- One Important Notice (two-sided document containing pertinent product serial numbers, and other important information).
- One Product Warranty.
- One packing slip.
- Two AC power cables (optional)
Specifically with the TMG7800-TE unit you will also have:
- One or two patch panel(s)
- Two SCSI cables per patch panel.
Not included
- A 19” equipment rack. The 7800 series telecom unit must be installed on a 19” wide equipment rack.
- USB-Type B cable. This can be used as an alternative way to connect to the serial port of the telecom unit.
7800-TMS Media Switch
In the 7800-TMS media switch box, you will find the following items:
- One 7800-TMS unit (TMG7800-TMS or TMGIP7800-TMS).
- Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length.
- One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800-TMS.
- One set of mounting brackets and screws, used to mount the TMG7800-TMS to a 19" rack.
- One Important Notice (two-sided document containing pertinent product serial numbers, and other important information).
- One Product Warranty.
- One packing slip.
- Two AC power cables (optional)
Not included
- A 19” equipment rack. The 7800-TMS must be installed on a 19” wide equipment rack.
- You must order one TelcoBridges CAT7 shielded Ethernet crossover cable, with RJ45 type male-male connectors, for each connection between 7800 Telecom units and a 7800-TMS.
- If your system features a second 7800-TMS, you must order an additional TelcoBridges CAT7 shielded Ethernet cable, with RJ45 male-male terminations, for each 7800 Telecom Unit.
7800 N+1 Patch Panel
The 7800 N+1 Patch Panel contains the following items:
- One 7800 N+1 patch panel.
- Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length.
- One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800 N+1 patch panel.
- One set of mounting brackets and screws, used to mount the 7800 N+1 patch panel to a 19" rack.
- Two AC power cables (optional)
- One packing slip.
- One Important Notice (two-sided document containing pertinent product serial numbers, and other important information).
- One Product Warranty.
Not included
- Optic fibers (They can be purchased from TelcoBridges).
- A 19” equipment rack. The 7800 N+1 patch panel must be installed on a 19” wide equipment rack.
7800 1+1 Patch Panels
1+1 patch panels are required for the proper connection of the 7800 series 1+1 system, and are automatically included when a 7800 +1 series unit is ordered. The following table lists various 1+1 patch panels you will receive based upon the type of 7800 series telecom unit ordered for your 7800 series 1+1 system.
| 1+1 Patch Panel (32/T1/E1) | Provides connection for up to 32 T1/E1 lines from the network to the 7800-TE and 7800-TE+1.
|
| 1+1 Patch Panel (DS3) | Provides connection for up to 3 DS3 lines from the network to the 7800-DS3 and 7800-DS3+1.
|
| 1+1 Patch Panel (STM1) | Provides connection of 1 STM1 line from the network to the 7800-STM1 and 7800-STM1+1.
|
Rack Mounting the 7800 Series Gateway Equipment
The 7800 series equipment is mounted on a customer provided equipment rack using the mounting hardware packaged in each box.
Prerequisites
To rack mount the equipment, you will need:
- One customer-provided equipment rack, measuring 19” in width and 31.5” in depth. The rack must be solidly anchored to the floor with appropriate support at the top of the racks.
- Climate controlled room: 0 to +50 Celsius, 0 to 95% non-condensing humidity.
Vertical Placement of the Equipment
The 7800-CTRL and 7800-TMS are each housed in 1U chassis, while 7800 Telecom units are housed in 2U chassis. It is important that you provide for enough room on the equipment rack to allow for the installation of the equipment.
Consider the available space on your equipment rack and the height of one or two 7800-CTRL unit(s), one to sixteen 7800 Telecom unit(s), and from zero to two TMG7800-TMS units. Due to the rear-exhaust heat vents and the efficient heat dissipation design, there is no need to leave any physical
vertical space above or below the 7800-CTRL unit(s), 7800 N+1 patch panel(s), 7800 Telecom unit(s), and the 7800-TMS unit(s) on the equipment rack.
| Tmedia Model Number | Vertical Height |
|---|---|
| 7800-CTRL | 1U (1.68 inches or 42.80 mm) |
| 7800 Telecom Unit | 1U (1.75 inches or 44.45 mm) |
| 7800-TMS | 1U (1.75 inches or 44.45 mm) |
| RJ48C Patch Panels | 1U (1.75 inches or 44.45 mm) |
| 7800 N+1 Patch Panels | 1U (1.75 inches or 44.45 mm) |
Installing the 7800 Series Gateway on an Equipment Rack
The 7800-CTRL, 7800 Telecom Unit, and 7800-TMS are mounted on a 19" equipment rack using the angle brackets and screws provided in the box.
7800-CTRL
To install the 7800-CTRL on the equipment rack, refer to either the static or sliding rails installation instructions in the following Dell document:
- Dell PowerEdge R330, (http://www.dell.com/support/home/us/en/19/productsupport/product/poweredge-r330/manuals)
7800 Telecom Units
- Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 Telecom Unit, when viewed from the front. Do the same for the angle bracket on the right-hand side.
- Start mounting equipment beneath the 7800-CTRL, keeping in mind the space required on the equipment rack.
- Repeat steps 1 and 2 for each additional 7800 Telecom Unit.
| f you are installing TMG7800-TE units you will require one to two patch panels per TMG7800-TE. Mount the patch panels beneath each TMG7800-TE. |
7800-TMS
- Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800-TMS, when viewed from the front. Do the same for the angle bracket on the right-hand side.
- Start mounting equipment beneath the last 7800 Telecom Unit, keeping in mind the space required.
- Repeat steps 1 and 2 for a second 7800-TMS.
7800 N+1 Patch Panel
- Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 N+1 patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side.
- Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack.
- Repeat steps 1 and 2 for a second 7800 N+1 patch panel.
7800 1+1 Patch Panel
- Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 1+1 patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side.
- Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack.
3. If required, repeat steps 1 and 2 for a second 7800 1+1 patch panel.
7800 RJ48C Patch Panel
- Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 RJ48C patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side.
- Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack.
- If required, repeat steps 1 and 2 for a second 7800 RJ48C patch panel.
Installing the 7800-CTRL
Connecting to the 7800 Series Gateway Management Interface
Connecting to the 7800 Series Control Network
Connecting to the Data Network
Powering Up
Connecting to AC Power
Installing the 7800 Series Telecom Units
Connecting to the Control Network
Connecting to the VoIP Network(s)
Connecting to the PSTN
SCSI Interface (T1/E1) for the TMG7800-TE
Standalone Configuration
1+1 Configuration
Dual BNC Interface (DS3) for the TMG7800-DS3
Standalone Configuration
1+1 Configuration
OC3/STM-1 Interface for the TMG7800-STM1
Standalone Configuration
1+1 Configuration
N+1 Configuration
Connecting to the TMS Network
Connecting to the TMG7800 Telecom Units
Prerequisites
Interconnections
Interconnecting Two 7800 Telecom Units
Grounding the Equipment Chassis
Powering Up
Connecting to AC Power
Connecting to DC Power
Installing the 7800-TMS
Connecting to the Control Network
Grounding the Equipment Chassis
7800 TMS
Powering Up
Connecting to AC Power
Connecting to DC Power
TDM System Clock
Installing the 7800 N+1 Patch Panel
Connecting Fiber Optic Cables to the 7800 N+1 Patch Panel
Connecting to the Control Network
Grounding the Equipment Chassis
Connecting to AC Power
Start Up and Verification
Start Up
Verifying the LED Status Indications
7800-CTRL
7800 Telecom Unit
7800-TMS
7800 N+1 Patch Panel
Powering Down the Equipment
7800-CTRL
Local Method
Remote Method
7800 Telecom Unit
7800-TMS
7800 N+1 Patch Panel
Initial System Configuration
7800 Series Gateway SSH Connection
7800 Series Gateway Serial Connection
Connecting to the 7800-CTRL Console
Configuring the Terminal Emulator Application
Changing the 7800 Series Gateway Management Port IP Address
Retrieving 7800 Series Gateway Information
Changing 7800 Series Gateway Management Port Passwords
Configuring the 7800 Series Gateway Using the Web Portal
System Backups
Creating a Database Backup
Downloading a Database Backup
Uploading a Database Backup
Restoring a Database Backup
Wiring Diagrams
RJ48C Wiring Diagram: Crossover and Straight Cables
RJ48 Console Wiring Diagram