Actions

7800 Series Gateway: Difference between revisions

Line 215: Line 215:


===Connecting to the TMS Network===
===Connecting to the TMS Network===
---
----
<br><br>
 
====Connecting to the TMG7800 Telecom Units====
----
<br><br>
 
=====Prerequisites=====
----
<br><br>
 
=====Interconnections=====
----
<br><br>
 
====Interconnecting Two 7800 Telecom Units====
----
<br><br>
 
===Grounding the Equipment Chassis===
----
<br><br>
 
===Powering Up===
----
<br><br>
 
====Connecting to AC Power====
----
<br><br>
 
====Connecting to DC Power====
----
<br><br>
 
==Installing the 7800-TMS==
----
<br><br>
 
===Connecting to the Control Network===
----
<br><br>
 
===Grounding the Equipment Chassis===
----
<br><br>
 
====7800 TMS====
----
<br><br>
 
===Powering Up===
----
<br><br>
 
====Connecting to AC Power====
----
<br><br>
 
====Connecting to DC Power====
----
<br><br>
 
===TDM System Clock===
----
<br><br>
 
==Installing the 7800 N+1 Patch Panel==
----
<br><br>
 
===Connecting Fiber Optic Cables to the 7800 N+1 Patch Panel===
----
<br><br>
===Connecting to the Control Network===
----
<br><br>
===Grounding the Equipment Chassis===
----
<br><br>
===Connecting to AC Power===
----
<br><br>
 
==Start Up and Verification==
----
<br><br>
 
===Start Up===
----
<br><br>
 
===Verifying the LED Status Indications===
----
<br><br>
 
====7800-CTRL===
----
<br><br>
 
====7800 Telecom Unit===
----
<br><br>
 
====7800-TMS====
----
<br><br>
 
====7800 N+1 Patch Panel====
----
<br><br>
 
==Powering Down the Equipment==
----
<br><br>
 
===7800-CTRL===
----
<br><br>
 
====Local Method====
----
<br><br>
 
====Remote Method====
----
<br><br>
 
===7800 Telecom Unit===
----
<br><br>
 
===7800-TMS===
----
<br><br>
===7800 N+1 Patch Panel===
----
<br><br>
 
==Initial System Configuration==
----
<br><br>
===7800 Series Gateway SSH Connection===
----
<br><br>
===7800 Series Gateway Serial Connection===
----
<br><br>
====Connecting to the 7800-CTRL Console====
----
<br><br>
====Configuring the Terminal Emulator Application====
----
<br><br>
===Changing the 7800 Series Gateway Management Port IP Address===
----
<br><br>
 
===Retrieving 7800 Series Gateway Information===
----
<br><br>
===Changing 7800 Series Gateway Management Port Passwords===
----
<br><br>
===Configuring the 7800 Series Gateway Using the Web Portal===
----
<br><br>
 
==System Backups==
----
<br><br>
 
===Creating a Database Backup===
----
<br><br>
 
===Downloading a Database Backup===
----
<br><br>
 
===Uploading a Database Backup===
----
<br><br>
 
===Restoring a Database Backup===
----
<br><br>
 
==Wiring Diagrams==
----
<br><br>
 
===RJ48C Wiring Diagram: Crossover and Straight Cables===
----
<br><br>
 
===RJ48 Console Wiring Diagram===
----
<br><br>
<br><br>

Revision as of 10:20, 8 October 2024

Hide TOC

About this Guide


This guide provides installation, and setup procedures for the 7800 series gateway.

Conventions


Contact Us


Introduction


Identifying the 7800 Series Gateway Equipment


Installation Prerequisites


7800-CTRL


7800 Series Telcom Units


7800-TMS


7800 N+1 Patch Panel


7800 1+1 Patch Panel


7800 RJ48C Patch Panel


Preventing Electrostatic Discharge Damage


Electrostatic discharge (ESD) can damage equipment and impair electrical circuitry. This may occur if electronic printed circuit cards are improperly handled and may cause complete or intermittent failure.





Always follow ESD prevention procedures when removing and replacing modules:
  • Ensure that the equipment is grounded.
  • Wear an ESD-preventive wrist strap and ensure that it makes good contact with your skin. Connect the wrist strap clip to an unpainted surface of the equipment or the grounded equipment rack in order to channel away all ESD voltage safely to ground. To guard against ESD damage and shocks, the wrist strap and cord must be in proper working condition.
  • If no wrist strap is available, and you must work with the equipment, ground yourself by touching a metal part of the chassis.



Recommended Reading


This document is written with the assumption that you have a clear understanding of the installation of the equipment described in this document and you are trained to work with the equipment. If you have any technical questions, TelcoBridges TB Support can be reached at the following numbers, or an email can be sent to: support.


  • Americas & Europe Technical Support Centre (GMT-05:00, Montreal): Telephone: +1-450-655-8993 x131 or x102
  • Asia Technical Support Centre (GMT +08:00, Hong Kong): Telephone: +852-3749-9818
  • 24/7 International Support: Telephone: +1-866-438-4703



Installation Preparations




7800-CTRL Gateway Controllers




7800 Series Telecom Unit




7800-TMS Media Switch




7800 N+1 Patch Panel




7800 1+1 Patch Panels




Rack Mounting the 7800 Series Gateway Equipment




Prerequisites




Vertical Placement of the Equipment




Installing the 7800 Series Gateway on an Equipment Rack




7800-CTRL




7800 Telecom Units




7800-TMS




7800 N+1 Patch Panel




7800 1+1 Patch Panel




7800 RJ48C Patch Panel




Installing the 7800-CTRL




Connecting to the 7800 Series Gateway Management Interface




Connecting to the 7800 Series Control Network




Connecting to the Data Network




Powering Up




Connecting to AC Power




Installing the 7800 Series Telecom Units




Connecting to the Control Network




Connecting to the VoIP Network(s)




Connecting to the PSTN




SCSI Interface (T1/E1) for the TMG7800-TE




Standalone Configuration



1+1 Configuration



Dual BNC Interface (DS3) for the TMG7800-DS3




Standalone Configuration



1+1 Configuration



OC3/STM-1 Interface for the TMG7800-STM1




Standalone Configuration



1+1 Configuration



N+1 Configuration



Connecting to the TMS Network




Connecting to the TMG7800 Telecom Units




Prerequisites



Interconnections



Interconnecting Two 7800 Telecom Units




Grounding the Equipment Chassis




Powering Up




Connecting to AC Power




Connecting to DC Power




Installing the 7800-TMS




Connecting to the Control Network




Grounding the Equipment Chassis




7800 TMS




Powering Up




Connecting to AC Power




Connecting to DC Power




TDM System Clock




Installing the 7800 N+1 Patch Panel




Connecting Fiber Optic Cables to the 7800 N+1 Patch Panel




Connecting to the Control Network




Grounding the Equipment Chassis




Connecting to AC Power




Start Up and Verification




Start Up




Verifying the LED Status Indications




=7800-CTRL




=7800 Telecom Unit




7800-TMS




7800 N+1 Patch Panel




Powering Down the Equipment




7800-CTRL




Local Method




Remote Method




7800 Telecom Unit




7800-TMS




7800 N+1 Patch Panel




Initial System Configuration




7800 Series Gateway SSH Connection




7800 Series Gateway Serial Connection




Connecting to the 7800-CTRL Console




Configuring the Terminal Emulator Application




Changing the 7800 Series Gateway Management Port IP Address




Retrieving 7800 Series Gateway Information




Changing 7800 Series Gateway Management Port Passwords




Configuring the 7800 Series Gateway Using the Web Portal




System Backups




Creating a Database Backup




Downloading a Database Backup




Uploading a Database Backup




Restoring a Database Backup




Wiring Diagrams




RJ48C Wiring Diagram: Crossover and Straight Cables




RJ48 Console Wiring Diagram