About this Guide


This guide provides installation, and setup procedures for the 7800 series gateway.

Conventions


Product Term Usage
Terminology Description
7800 series gateway This term is used when a description applies to both a TMG7800 and the TMGIP7800 systems.
7800 series system This term is used when a description applies to a TMG7800-CTRL, TMG7800 Telecom Unit and TMG7800-TMS.
TMGIP7800 system This term is used when a description applies to a TMGIP7800-CTRL, TMGIP7800 Telecom Unit and TMGIP7800-TMS.
7800-TE This term is used when a description applies to TMG7800-TE.
7800-DS3 This term is used when a description applies to the TMG7800-DS3.
7800-CTRL This term is used when a description applies to a TMG7800-CTRL and TMGIP7800-CTRL.
7800-TMS his term is used when a description applies to a TMG7800-TMS and TMGIP7800-TMS.
TMG7800 +1 This term is used when a description applies to a TMG7800 that is selected to provide N+1 protection.
7800 N+1 Patch Panel This term is used to refer to patch panels for TMG7800 systems that have N+1

protection.

Contact Us


If you have comments about this guide or any other TelcoBridges technical documentation, please send an email to marketing.

Introduction




Identifying the 7800 Series Gateway Equipment


The 7800 series gateway is comprised of the following equipment:

  • One or two 7800-CTRL gateway controller(s).
  • One to sixteen 7800 Telecom Unit(s).
  • Based upon the configuration of your 7800 series gateway, the number of 7800-TMS media switches may range from zero to two.
  • If the 7800 series gateway employs N+1 protection, one to two 7800 N+1 patch panels are used to provide protection for the TDM network.
  • If the 7800 series gateway employs 1+1 protection, one to two 1 +1 patch panels are used to provide protection for the TDM network.



Installation Prerequisites


For the installation to proceed without interruption, it is important that you verify you have all necessary materials on hand.


A TMG7800 system can range in size from 2 to 22U in vertical rack space, at full capacity with redundant N+1 patch panels. In addition, if your system is configured to use multiple groups of 1+1 patch panels, the total vertical rack space may exceed 22U.

7800-CTRL


For information about the 7800-CTRL, refer to Dell’s documentation:

http://www.dell.com/support/home/us/en/04/product-support/product/poweredge-r330/manuals


Adequate space for the installation of the 7800-CTRL

You must mount the 7800-CTRL on a 19" equipment rack (customer provided). Your 7800-CTRL is a 1U unit. Plan for an additional 1U space on the equipment rack for a redundant 7800-CTRL.

The depth of the 7800-CTRL is greater than the 16” (406mm) depth of the 7800 series telecom units. It is important to plan for an equipment rack of adequate size.


The dimension of the 7800-CTRL (without bezel and redundant power supply)

  • Height x Width x Depth (mm) 42.8 x 434.0 x 625.0
  • Height x Width x Depth (inch) 1.68 x 17.08" x 24.60"

Adequate power supply and power connections

Each 7800-CTRL requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.


An IP address for the management port

Each 7800-CTRL requires a IP address for the management port. To avoid delays, you should have the IP address, netmask and gateway addresses on hand. Take note that the management port supports DHCP.


Cabling

Three customer supplied Ethernet cables are required for each 7800-CTRL, to connect the 7800-CTRL to the switches.



7800 Series Telcom Units


Adequate space for the installation of each 7800 Series Telecom Unit

You must install each 7800 Series Telecom Unit (1-16 units) on a 19" equipment rack (customer provided). Each 7800 Series Telecom Unit is housed in a 1U chassis.


Adequate power supply and power connections

Each 7800 Series Telecom Unit requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.

7800-TMS


Adequate space for the installation of the 7800-TMS

You will need to mount the 7800-TMS on a 19" equipment rack (customer provided). Your 7800-TMS is a 1U unit. Plan for an additional 1U space on the equipment rack for a redundant 7800-TMS.


Adequate power supply and power connections

Each 7800-TMS requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.

7800 N+1 Patch Panel


Adequate space for the installation of the 7800 N+1 Patch Panel

If your system employs N+1 protection, you will need to mount the 7800 N+1 patch panel on a 19" equipment rack (customer provided). Your 7800 N+1 patch panel is a 1U unit. If your system is using Automatic Protection Switching (APS), plan for an additional 1U space on the equipment rack for a second 7800 N+1 patch panel.


Adequate power supply and power connections

Each 7800 N+1 patch panel requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.



7800 1+1 Patch Panel


Adequate space for the installation of the 7800 1+1 Patch Panel

If your system employs 1+1 protection, you will need to mount one or two 7800 1+1 patch panels on a 19" equipment rack (customer provided). Your 7800 1+1 patch panel is a 1U unit.


Adequate power supply and power connections

Each 7800 1+1 patch panel requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.

7800 RJ48C Patch Panel


Adequate space for the installation of the 7800 RJ48C Patch Panel

In a standalone configuration, you will need to mount one or two 7800 RJ48C patch panels on a 19" equipment rack (customer provided). Your 7800 RJ48C patch panel is a 1U unit.


Adequate power supply and power connections

Each 7800 RJ48C patch panel requires two power connections to provide for its redundant power supply. To guarantee an uninterrupted supply of electricity, each power connection must be fed by a dedicated power source.

Preventing Electrostatic Discharge Damage


Electrostatic discharge (ESD) can damage equipment and impair electrical circuitry. This may occur if electronic printed circuit cards are improperly handled and may cause complete or intermittent failure.





Always follow ESD prevention procedures when removing and replacing modules:
  • Ensure that the equipment is grounded.
  • Wear an ESD-preventive wrist strap and ensure that it makes good contact with your skin. Connect the wrist strap clip to an unpainted surface of the equipment or the grounded equipment rack in order to channel away all ESD voltage safely to ground. To guard against ESD damage and shocks, the wrist strap and cord must be in proper working condition.
  • If no wrist strap is available, and you must work with the equipment, ground yourself by touching a metal part of the chassis.



Recommended Reading


This document is written with the assumption that you have a clear understanding of the installation of the equipment described in this document and you are trained to work with the equipment. If you have any technical questions, TelcoBridges TB Support can be reached at the following numbers, or an email can be sent to: support.


  • Americas & Europe Technical Support Centre (GMT-05:00, Montreal): Telephone: +1-450-655-8993 x131 or x102
  • Asia Technical Support Centre (GMT +08:00, Hong Kong): Telephone: +852-3749-9818
  • 24/7 International Support: Telephone: +1-866-438-4703



Installation Preparations





7800-CTRL Gateway Controllers

In the box, you will find the following items:



7800 Series Telecom Unit


In the box, you will find the following items:

  • One 7800 series unit (TMGIP7800, TMG7800-TE, TMG7800-DS3, or TMG7800-STM1).
  • One set of mounting brackets and screws, used to mount the 7800 series telecom unit to a 19" rack.
  • One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800 series telecom unit.
  • Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length.
  • One Important Notice (two-sided document containing pertinent product serial numbers, and other important information).
  • One Product Warranty.
  • One packing slip.
  • Two AC power cables (optional)


Specifically with the TMG7800-TE unit you will also have:

  • One or two patch panel(s)
  • Two SCSI cables per patch panel.

Not included

  • A 19” equipment rack. The 7800 series telecom unit must be installed on a 19” wide equipment rack.
  • USB-Type B cable. This can be used as an alternative way to connect to the serial port of the telecom unit.



7800-TMS Media Switch


In the 7800-TMS media switch box, you will find the following items:

  • One 7800-TMS unit (TMG7800-TMS or TMGIP7800-TMS).
  • Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length.
  • One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800-TMS.
  • One set of mounting brackets and screws, used to mount the TMG7800-TMS to a 19" rack.
  • One Important Notice (two-sided document containing pertinent product serial numbers, and other important information).
  • One Product Warranty.
  • One packing slip.
  • Two AC power cables (optional)


Not included

  • A 19” equipment rack. The 7800-TMS must be installed on a 19” wide equipment rack.
  • You must order one TelcoBridges CAT7 shielded Ethernet crossover cable, with RJ45 type male-male connectors, for each connection between 7800 Telecom units and a 7800-TMS.
  • If your system features a second 7800-TMS, you must order an additional TelcoBridges CAT7 shielded Ethernet cable, with RJ45 male-male terminations, for each 7800 Telecom Unit.



7800 N+1 Patch Panel


The 7800 N+1 Patch Panel contains the following items:

  • One 7800 N+1 patch panel.
  • Three CAT5 Ethernet (blue) straight cables (male-male), 3 meters in length.
  • One Tmedia serial adapter to interface with the serial port of your computer with the RJ-45 port of the 7800 N+1 patch panel.
  • One set of mounting brackets and screws, used to mount the 7800 N+1 patch panel to a 19" rack.
  • Two AC power cables (optional)
  • One packing slip.
  • One Important Notice (two-sided document containing pertinent product serial numbers, and other important information).
  • One Product Warranty.

Not included

  • Optic fibers (They can be purchased from TelcoBridges).
  • A 19” equipment rack. The 7800 N+1 patch panel must be installed on a 19” wide equipment rack.



7800 1+1 Patch Panels


1+1 patch panels are required for the proper connection of the 7800 series 1+1 system, and are automatically included when a 7800 +1 series unit is ordered. The following table lists various 1+1 patch panels you will receive based upon the type of 7800 series telecom unit ordered for your 7800 series 1+1 system.

1+1 Patch Panels
1+1 Patch Panel (32/T1/E1) Provides connection for up to 32 T1/E1 lines from the network to the 7800-TE and 7800-TE+1.


To connect the 7800-TE-16 and the 7800-TE-32 to their respective +1 units and the network, you will required one 1+1 Patch Panel (32 T1/E1).


To connect the 7800-TE-48 and the 7800-TE-64 to their respective +1 units and the network, you will require two 1+1 Patch Panel (32 T1/E1).


Cables provided: 4 SCSI straight cables per 1+1 Patch Panel (32 T1/E1). Three meters in length. This provides connection for up to 32 lines.

1+1 Patch Panel (DS3) Provides connection for up to 3 DS3 lines from the network to the 7800-DS3 and 7800-DS3+1.


Cables provided (with each 1+1 Patch Panel (DS3)):

  • 4 DS3 cables, each two meters in length, are shipped for each DS3 that is ordered. (4, 8, or 12 cables)
  • 4 RJ48C straight cables (yellow), two meters in length.
1+1 Patch Panel (STM1) Provides connection of 1 STM1 line from the network to the 7800-STM1 and 7800-STM1+1.


Cables provided (with each 1+1 Patch Panel (STM1)):

  • 4 pairs of fiber optic cables, two meters in length.
  • 4 RJ48C straight cables (yellow), two meters in length.



Rack Mounting the 7800 Series Gateway Equipment


The 7800 series equipment is mounted on a customer provided equipment rack using the mounting hardware packaged in each box.

Prerequisites


To rack mount the equipment, you will need:

  • One customer-provided equipment rack, measuring 19” in width and 31.5” in depth. The rack must be solidly anchored to the floor with appropriate support at the top of the racks.
  • Climate controlled room: 0 to +50 Celsius, 0 to 95% non-condensing humidity.



Vertical Placement of the Equipment


The 7800-CTRL and 7800-TMS are each housed in 1U chassis, while 7800 Telecom units are housed in 2U chassis. It is important that you provide for enough room on the equipment rack to allow for the installation of the equipment.


Consider the available space on your equipment rack and the height of one or two 7800-CTRL unit(s), one to sixteen 7800 Telecom unit(s), and from zero to two TMG7800-TMS units. Due to the rear-exhaust heat vents and the efficient heat dissipation design, there is no need to leave any physical vertical space above or below the 7800-CTRL unit(s), 7800 N+1 patch panel(s), 7800 Telecom unit(s), and the 7800-TMS unit(s) on the equipment rack.

Tmedia VoIP Gateway Physical Height
Tmedia Model Number Vertical Height
7800-CTRL 1U (1.68 inches or 42.80 mm)
7800 Telecom Unit 1U (1.75 inches or 44.45 mm)
7800-TMS 1U (1.75 inches or 44.45 mm)
RJ48C Patch Panels 1U (1.75 inches or 44.45 mm)
7800 N+1 Patch Panels 1U (1.75 inches or 44.45 mm)



Installing the 7800 Series Gateway on an Equipment Rack


The 7800-CTRL, 7800 Telecom Unit, and 7800-TMS are mounted on a 19" equipment rack using the angle brackets and screws provided in the box.

7800-CTRL


To install the 7800-CTRL on the equipment rack, refer to either the static or sliding rails installation instructions in the following Dell document:



7800 Telecom Units


  1. Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 Telecom Unit, when viewed from the front. Do the same for the angle bracket on the right-hand side.
  2. Start mounting equipment beneath the 7800-CTRL, keeping in mind the space required on the equipment rack.
  3. Repeat steps 1 and 2 for each additional 7800 Telecom Unit.
If you are installing TMG7800-TE units you will require one to two patch panels per TMG7800-TE. Mount the patch panels beneath each TMG7800-TE.



7800-TMS


  1. Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800-TMS, when viewed from the front. Do the same for the angle bracket on the right-hand side.
  2. Start mounting equipment beneath the last 7800 Telecom Unit, keeping in mind the space required.
  3. Repeat steps 1 and 2 for a second 7800-TMS.



7800 N+1 Patch Panel


  1. Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 N+1 patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side.
  2. Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack.
  3. Repeat steps 1 and 2 for a second 7800 N+1 patch panel.



7800 1+1 Patch Panel


  1. Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 1+1 patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side.
  2. Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack.

3. If required, repeat steps 1 and 2 for a second 7800 1+1 patch panel.

7800 RJ48C Patch Panel


  1. Using four metal screws, attach one angle bracket to the front, left-hand side of the 7800 RJ48C patch panel, when viewed from the front. Do the same for the angle bracket on the right-hand side.
  2. Start mounting this equipment beneath the last 7800-TMS, keeping in mind the space required on the equipment rack.
  3. If required, repeat steps 1 and 2 for a second 7800 RJ48C patch panel.



Installing the 7800-CTRL




Connecting to the 7800 Series Gateway Management Interface




Connecting to the 7800 Series Control Network




Connecting to the Data Network




Powering Up




Connecting to AC Power




Installing the 7800 Series Telecom Units




Connecting to the Control Network




Connecting to the VoIP Network(s)




Connecting to the PSTN




SCSI Interface (T1/E1) for the TMG7800-TE




Standalone Configuration




1+1 Configuration




Dual BNC Interface (DS3) for the TMG7800-DS3




Standalone Configuration




1+1 Configuration




OC3/STM-1 Interface for the TMG7800-STM1




Standalone Configuration




1+1 Configuration




N+1 Configuration




Connecting to the TMS Network




Connecting to the TMG7800 Telecom Units




Prerequisites




Interconnections




Interconnecting Two 7800 Telecom Units




Grounding the Equipment Chassis




Powering Up




Connecting to AC Power




Connecting to DC Power




Installing the 7800-TMS




Connecting to the Control Network




Grounding the Equipment Chassis




7800 TMS




Powering Up




Connecting to AC Power




Connecting to DC Power




TDM System Clock




Installing the 7800 N+1 Patch Panel




Connecting Fiber Optic Cables to the 7800 N+1 Patch Panel




Connecting to the Control Network




Grounding the Equipment Chassis




Connecting to AC Power




Start Up and Verification




Start Up




Verifying the LED Status Indications




7800-CTRL




7800 Telecom Unit




7800-TMS




7800 N+1 Patch Panel




Powering Down the Equipment




7800-CTRL




Local Method




Remote Method




7800 Telecom Unit




7800-TMS




7800 N+1 Patch Panel




Initial System Configuration




7800 Series Gateway SSH Connection




7800 Series Gateway Serial Connection




Connecting to the 7800-CTRL Console




Configuring the Terminal Emulator Application




Changing the 7800 Series Gateway Management Port IP Address




Retrieving 7800 Series Gateway Information




Changing 7800 Series Gateway Management Port Passwords




Configuring the 7800 Series Gateway Using the Web Portal




System Backups




Creating a Database Backup




Downloading a Database Backup




Uploading a Database Backup




Restoring a Database Backup




Wiring Diagrams




RJ48C Wiring Diagram: Crossover and Straight Cables




RJ48 Console Wiring Diagram