Actions

Optional configurations for SPIROU

Revision as of 12:02, 3 February 2017 by Allyntree (talk | contribs)

Applies to version(s): v2.6, v2.7, v2.8, v2.9, v2.10

Depending on the series of tests defined for the SPIROU certification, some additional steps might be required.


If a manual continuity check (CCR) is required (ART/ST/NRT/7-99/ed2.1 :: 4.2-1):


If Overlap dialing is tested ( ART/ST/NRT/7-99/ed2.1 :: 4.3.1-7a ) :


If Transit Network Selection is required ( ART/ST/NRT/7-99/ed2.1 :: 4.3.5 ):