Actions

Continuity Testing Call Flow (CCR/COT)

Revision as of 16:15, 23 April 2014 by Nicole Tan (talk | contribs)

Continuity tests are used to make sure that the SS7 ISUP interface circuit groups (CIC) are aligned with the physical links (E1/T1) properly. Toolpack version 2.7 allows users of the TMG to do ISUP Continuity Testing via 3 methods by CIC Group or individual CIC:

Incoming Continuity testing outside a call

This circuit testing occurs when one of the nodes wants to validate a currently idle circuit. It is recommended that the switch first blocks the circuit to prevent calls to use the circuit during the testing.


Peer SP TMG

IAM - - - - - - - - - - ->


Check tone - - - - - - - - - - -|

               - - - - - - - - - -

REL - - - - - - - - - - ->

              < -- - - - - - - - - -          RLC


For ANSI protocol: Peer SP TMG CCR - - - - - - - - - - ->

              < -- - - - - - - - - -          LPA

Check tone - - - - - - - - - - -|

               - - - - - - - - - -

REL - - - - - - - - - - ->

              < -- - - - - - - - - -          RLC


Incoming Continuity testing within a call

This circuit testing occurs when the forward side (originating side) sets the ‘continuity test required’ field of the ‘nature of connection indicators’ IE into the IAM message.

Peer SP TMG IAM - - - - - - - - - - -> Check tone - - - - - - - - - - -|

             - - - - - - - - - - -

COT (successful) - - - - - - - - -->

            <- - - - - - - - - - -            ACM
             - - - - - - - - - - -            Ringing tone
            <- - - - - - - - - - -            ANM

Connectivity - - - - - - - - - - Connectivity REL - - - - - - - - - - ->

            <- - - - - - - - - - - RLC

Outgoing COT testing

Peer SP TMG

           < - - - - - - - - - - -            CCR
           |- - - - - - - - - - -             Check tone
             - - - - - - - - - -
           < - - - - - - - - - - -            REL 

RLC -- - - - - - - - - - ->

Configuration